Power

Western Turner Syncline

Western Turner Syncline

  • Client: Monadelphous
  • Project Timeframe: April 2013- March 2014
  • Location: Tom Price Mine, Pilbara Region, WA
  • Contract Value: $22 million

The design and construction of the 33kV distribution infrastructure to serve the WTS Section 10 primary crushing, overland conveying and stockpiling facilities.

Mungullah Power Station Carnarvon

Mungullah Power Station Carnarvon

  • Client: Horizon Power
  • Project Timeframe: Feb 2013- May 2014
  • Location: Carnarvon, Western Australia
  • Contract Value: $10 million

Contraflow was engaged to complete a Balance of Plant agreement for works at the Mungullah Power Station in Carnarvon, owned and operated by Horizon Power.

Wickham Underground Cable Replacement

Wickham Underground Cable Replacement

  • Client: Rio Tinto Iron Ore
  • Project Timeframe: June 2011- April 2013
  • Location: Town of Wickham, Karratha
  • Contract Value: $6 million

Decommissioning and replacement of the existing 415V consac cables and service pillars in the town of Wickham

Lancelin Wind Farm

Lancelin Wind Farm

  • Client: Blair Fox
  • Project Timeframe: May 2012 – Aug 2012
  • Location: Lancelin WA
  • Contract Value: $3.5 million

 Supply, installation, testing, commissioning and certification of high voltage distribution for two wind farms in the Lancelin area.

Chichester Power Distribution Network Expansion

Chichester Power Distribution Network Expansion

  • Client: Fortescue Metals Group
  • Project Timeframe: Mar 2012 – Aug 2012
  • Location: Christmas Creek, Chichester Range WA
  • Contract Value: $8.8 million

Design, supply, fabrication, transportation, site installation, testing, commissioning and close-out for the expansion of the Christmas Creek Chichester Power Network. 

North Ridge Borefield

North Ridge Borefield

  • Client: Rio Tinto Iron Ore
  • Project Timeframe: Apr 2011 – Aug 2011
  • Location: Yandi, Newman WA
  • Contract Value: $1 million

Installation, construction, testing and commissioning of the Ridge North Bore field project

7 Mile Rail Facility Network Connection

7 Mile Rail Facility Network Connection

  • Client: Rio Tinto Iron Ore
  • Project Timeframe: Dec 2010 – Oct 2011
  • Location: 7 Mile, Karratha WA
  • Contract Value: $4 million

Design, supply and install 5km of 33kV overhead line at the 7 Mile Rail Facility Network

Cloudbreak Power Network

Cloudbreak Power Network

  • Client: Fortescue Metals Group
  • Project Timeframe: Aug 2010 – Jul 2011
  • Location: Cloudbreak, Chichester WA
  • Contract Value: $6.5 million

Electrical expansion works including power station relocation, village expansion and substation works and maintenance.

Garden Wells Gold Mine

Garden Wells Gold Mine

  • Client: Regis Resources
  • Project Timeframe: Oct 2012 - April 2013
  • Location: Laverton, WA
  • Contract Value: $3 million

Engineering, design, supply, installation, testing, commissioning and certification of 11kV high voltage distribution line for Garden Wells Gold Mine, owned and operated by Regis Resources.